Wastewater Treatment Plant Construction

Year
2022-2024
Location
Northern Bulgaria
Client
Municipality and state funding
Our role
Geodesy, staking of technological structures, as-built documentation

About the project

Construction of a new wastewater treatment plant (WWTP) — a complex infrastructure object with biological treatment, technological lines and incoming sewer.

Our role

  • Geodetic source data — terrain survey, reference network;
  • Staking of complex technological structures — reactors, settlers, pump stations, pipelines;
  • Execution control — especially levels and slopes of sewer routes;
  • As-built drawings of technological part and site infrastructure;
  • Coordination with technologists, structural engineers, V&K designers.

Why it was challenging

WWTP projects require high geodetic accuracy: sewer slopes are in small per mille — centimeter deviation means non-functional plant. Technological structures must be perfectly aligned for proper gravity flow. Underground routes must have precise as-built documentation for future maintenance.