Geodetic Survey for Act 16

As-built survey of completed building and infrastructure — mandatory document when applying for issuance of Act 16 (Use Permit).

What's included

  • Survey of finished building and comparison with project
  • Infrastructure control (water, parking, accesses)
  • As-built drawings preparation
  • Documentation set for Acts 14, 15, 16

Why a geodetic survey is mandatory for Act 16

Issuing Act 16 — “Use Permit” is the final administrative act in the construction process. Without it the building cannot be put into operation, registered as completed in the cadastre, or transferred to buyers.

A key part of the documentation for Act 16 is the as-built geodetic documentation. It certifies that:

  1. The building was realized in accordance with the approved working project;
  2. The surrounding infrastructure (parking, accesses, water manholes) is correctly executed;
  3. The building is vertically aligned and main axes match the project;
  4. There are current coordinates of the building for registration in the cadastral map.

What our service includes

1. Project documentation review

  • Approved working project, construction permit, Act 14, active PUP.

2. Field survey

Our surveyors capture: the building (contours, height, levels), surrounding infrastructure (paving, parking, fences), underground utilities (water manholes, connections), surrounding terrain.

3. Project ↔ execution comparison

In specialized software (AutoCAD Civil) we overlay actual execution on project position and identify all deviations in plan, height, and detail geometry.

4. As-built drawings

  • As-built site plan; vertical layouts; infrastructure schemas; building coordinate register.

Why clients choose us for Act 16

  • Experience with 500+ projects in Sofia and Pleven;
  • Fast turnaround — typically 5–10 working days;
  • Coordination with architects, structural engineers, construction supervisors, investors;
  • Active procedure management — we assist with DNSK and municipal administration when needed.

Frequently asked questions

What is Act 16 and the surveyor's role?

Act 16 is the "Use Permit" — the document certifying that a building is completed in accordance with the approved project and can be transferred to the investor and registered in the cadastre. The surveyor provides the as-built survey, comparing actual execution with the project, and without it the Act 16 application cannot be filed.

How much does an Act 16 survey cost?

For a single-family house in Sofia — from 450 BGN excl. VAT. For multi-family buildings and complex objects — from 800 BGN to several thousand depending on scope.

Do you also handle Act 14 and Act 15?

Yes. We prepare as-built geodetic documentation for all interim acts — Act 14 (rough construction), Act 15 (completed building), and for every stage of the construction permit.

Need survey for act 16?

Need geodetic or cadastral services?

Get an offer within 24 hours.