Infrastructure

Zheleznitsa Tunnel

Year
2019-2024
Location
Struma Motorway, Lot 3.3
Client
NKSIP
Our role
Geodetic survey, reference network, staking, bore control, as-built documentation

About the project

Zheleznitsa Tunnel is part of Struma Motorway, Lot 3.3 — one of the most complex engineering projects executed in Bulgaria in recent years. The two parallel tunnel tubes pass through complex geological conditions and require exceptional geodetic accuracy.

Our role

  • Reference geodetic network — establishing and maintaining a precision network in and around the tunnel;
  • Bore control — monitoring tunnel boring machines and ensuring correct meeting of the two bores;
  • Geometric measurements — cross-section, convergence and deformation control during construction;
  • As-built documentation — drawings, BIM model, documentation for acceptance acts.

Technologies

  • 3D laser scanning of cross-sections;
  • Precision total stations for underground measurements;
  • Precision geometric level for height control;
  • GNSS reference network on surface above the alignment.